Client:
Scottish Water Solutions
Drilling under the river Spey 287m long and installing a 280mm HPPE pumping main pipe along with a 110mm HPPE telecommunication duct on a Scottish Water Project.
The pipeline crossed the River Spey and involved directional drilling underneath the watercourse.